Home > NRC Library > ADAMS Public Documents
SECY-18-0042: Draft Final NUREG/BR-0058, Revision 5, "Regulatory Analysis Guidelines of the U.S Nuclear Regulatory Commission"
Accession Number: ML17221A000
Date Released: Thursday, April 12, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17221A003 - SECY-18-0042: Draft Final NUREG/BR-0058, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission (7 page(s), 3/28/2018)
- ML17221A005 - SECY-18-0042: Enclosure 1 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC (50 page(s), 3/28/2018)
- ML17221A006 - SECY-18-0042: Enclosure 2 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC, Appendix A, Qualitative Factors Assessment Tools (17 page(s), 3/28/2018)
- ML17221A007 - SECY-18-0042: Enclosure 3 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC, Appendix B, Cost Estimating and Best Practices (20 page(s), 3/28/2018)
- ML17221A008 - SECY-18-0042: Enclosure 4 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC, Appendix C, Treatment of Uncertainty (25 page(s), 3/28/2018)
- ML17221A009 - SECY-18-0042: Enclosure 5 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC, Appendix D, Guidance on Regulatory Analysis Related to ASME Code Rules (25 page(s), 3/28/2018)
- ML17221A010 - SECY-18-0042: Enclosure 6 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC, Appendix E, Special Circumstances and Relationship to Other Procedural Requirements (25 page(s), 4/12/2018)
- ML17221A011 - SECY-18-0042: Enclosure 7 - NUREG/BR-0058, Rev 5, Regulatory Analysis Guidelines of the U.S. NRC, NRC Response to Public Comments (25 page(s), 3/28/2018)
- ML17221A004 - SECY-18-0042: Enclosure 8 - Federal Register Notice: Regulatory Analysis Guidelines of the U.S. NRC, Revision 5 (20 page(s), 3/28/2018)