Home > NRC Library > ADAMS Public Documents
VCSNS FSER - Summer Chapters 1- 20 and Appendices Master.
Accession Number: ML110450305
Date Released: Thursday, August 18, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML110310049 - FSER - VCSNS Chapter 1 Clean Master, Introduction and Interfaces. (95 page(s), 8/17/2011)
- ML110310051 - FSER - VCSNS Chapter 2 Text Clean Master, Site Characteristics. (292 page(s), 8/17/2011)
- ML110310056 - FSER - VCSNS Chapter 2 Figures 1 Clean Master (Figs 2.4-1 through 2.4-3; Figs 2.5-1 through 2.5-4; Figs 2.5.2-1 through 2.5.2-12). (18 page(s), 8/17/2011)
- ML110310058 - FSER - VCSNS Chapter 2 Figures 3 Clean Master (Fig 2.5.3-1; Figs 2.5.4-1 through 2.5.4-4). (5 page(s), 8/17/2011)
- ML110310059 - FSER - VCSNS Chapter 2 Tables Clean Master (Table 2.3.1-1; Tables 2.4-1 through 2.4-2; Tables 2.5.2-1 through 2.5.2-2; Tables 2.5.4-1 through 2.5.4-3). (5 page(s), 8/17/2011)
- ML110310057 - FSER - VCSNS FSER Chapter 2 Figures 2 (Figs 2.5.2-13 through 2.5.2-17). (5 page(s), 8/17/2011)
- ML110310060 - FSER - VCSNS Chapter 3 Clean Master, Design of Structures, Components, Equipment and Systems. (96 page(s), 8/17/2011)
- ML110310061 - FSER - VCSNS Chapter 4 Clean Master, Reactor. (6 page(s), 8/17/2011)
- ML110310066 - FSER - VCSNS Chapter 5 Clean Master, Reactor Coolant System and Connected Systems. (61 page(s), 8/17/2011)
- ML110310068 - FSER - VCSNS Chapter 6 Clean Master, Engineered Safety Features. (42 page(s), 8/17/2011)
- ML110310069 - FSER - VCSNS Chapter 7 Clean Master, Instrumentation and Controls. (8 page(s), 8/17/2011)
- ML110310070 - FSER - VCSNS Chapter 8 Clean Master, Electric Power. (39 page(s), 8/17/2011)
- ML110310073 - FSER - VCSNS Chapter 9 Clean Master, Auxiliary Systems. (93 page(s), 8/17/2011)
- ML110310074 - FSER - VCSNS Chapter 10 Clean Master, Steam and Power Conversion. (34 page(s), 8/17/2011)
- ML110310075 - FSER - VCSNS Chapter 11 Clean Master, Radioactive Waste Management. (44 page(s), 8/17/2011)
- ML110310078 - FSER - VCSNS Chapter 12 Clean Master, Radiation Protection. (41 page(s), 8/17/2011)
- ML110310185 - FSER - VCSNS Chapter 13 Clean Master, Conduct of Operations. (265 page(s), 8/17/2011)
- ML110350027 - FSER - VCSNS Chapter 13 Tables Clean Master, Emergency Plan ITAAC. (16 page(s), 8/17/2011)
- ML110310079 - FSER - VCSNS Chapter 14 Clean Master, Initial Test Program. (62 page(s), 8/17/2011)
- ML110390054 - FSER - VCSNS Chapter 15 Clean Master, Accident Analysis. (25 page(s), 8/17/2011)
- ML110310083 - FSER - VCSNS Chapter 16 Clean Master, Technical Specifications. (13 page(s), 8/17/2011)
- ML110310084 - FSER - VCSNS Chapter 17 Clean Master, Quality Assurance (Related to RG 1.206, Section C.III.1, Chapter 17, C.I.17,"Quality Assurance and Reliability Assurance." (40 page(s), 8/17/2011)
- ML110310087 - FSER - VCSNS Chapter 18 Clean Master, Human Factors Engineering. (25 page(s), 8/17/2011)
- ML110310090 - FSER - VCSNS Chapter 19, Probabilistic Risk Assessment. (26 page(s), 8/17/2011)
- ML110310224 - FSER - VCSNS Appendix 19.A LOLA Public, Loss of Large Areas of The Plant Due to Explosions or Fires. (5 page(s), 8/17/2011)
- ML111990136 - FSER - VCSNS Chapter 20, Conclusion. (1 page(s), 8/17/2011)
- ML110310042 - Appendix A - VCSNS FSER Appendix A, Post COL Activities, License Conditions, Inspections, Tests, Analyses, and Acceptance Criteria, and Final Safety Analysis Report Commitments. (39 page(s), 8/17/2011)
- ML111990155 - Appendix B - VCSNC FSER Chronology Report. (183 page(s), 8/17/2011)
- ML111940301 - Appendix C - VCSNC FSER Request for Additional Information. (21 page(s), 8/17/2011)
- ML110030028 - Appendix D - VCSNS FSER References. (31 page(s), 8/17/2011)
- ML111741213 - Appendix E - VCSNC FSER Principal Contributors. (5 page(s), 8/17/2011)
- ML111950023 - Appendix F - VCSNC FSER Report by the Advisory Committee on Reactor Safeguards. (7 page(s), 8/17/2011)
- ML111920401 - Final Safety Evaluation Report for the V.C. Summer Nuclear Station Units 2 and 3 Combined License Application. (6 page(s), 8/17/2011)