Home > NRC Library > ADAMS Public Documents
Comanche Peak, Units 3 and 4 Responses to Requests for Additional Information No. 2990, 2999, 3230, 3663, 3664, 3665, 3666, 3667, 3668, 3669, 3670, 3671, and 3672.
Accession Number: ML093230705
Date Released: Friday, November 27, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML093230704 - Comanche Peak, Units 3 and 4 Responses to Requests for Additional Information No. 2990, 2999, 3230, 3663, 3664, 3665, 3666, 3667, 3668, 3669, 3670, 3671, and 3672 for Combined License Application. (126 page(s), 11/13/2009)
- ML093230712 - Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Cover through Appendix A, Page 80 of 475. (108 page(s), 8/14/2009)
- ML093230714 - Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Appendix A, Page 81 of 475 through Page 180 of 475. (100 page(s), 8/14/2009)
- ML093230715 - Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Appendix A, Page 181 of 475 through Page 200 of 475. (20 page(s), 8/14/2009)
- ML093230716 - Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Appendix A, Page 201 of 475 through Page 300 of 475. (100 page(s), 8/14/2009)
- ML093230717 - Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Appendix A, Page 301 of 475 through Page 400 of 475. (100 page(s), 8/14/2009)
- ML093230718 - Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Appendix A, Page 401 of 475 through End. (75 page(s), 8/14/2009)