Home > NRC Library > ADAMS Public Documents
03/05/03, Meeting between Nuclear Regulatory Commission Staff and Stakeholders concerning Generic Safety Issue 191, "Assessment of Debris Accumulation on PWR Sump Performance".
Accession Number: ML031000578
Date Released: Wednesday, May 4, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031000493 - 03/05/03, Meeting between Nuclear Regulatory Commission Staff and Stakeholders concerning Generic Safety Issue 191, "Assessment of Debris Accumulation on PWR Sump Performance". (5 page(s), 4/24/2003)
- ML031180084 - Current Status and Plans Resolution of GSI-191, Attachment 2 to 03/05/03 NEI Meeting. (3 page(s), 3/5/2003)
- ML031180095 - NRC Comments on NEI Draft Evaluation Methodology Ground Rules, Attachment 4 to 03/05/03 NEI Meeting. (16 page(s), 3/5/2003)
- ML031180102 - Update of PWR Industry Plan to Address GSI-191, Attachment 5 to 03/05/03 NEI Meeting. (10 page(s), 3/5/2003)
- ML031180119 - GSI-191: Analysis of Recovery Options, Attachment 6 to 03/05/03 NEI Meeting. (13 page(s), 3/5/2003)
- ML031180127 - Debris Accumulation & CalSil Head Loss Testing - Findings & Preliminary Conclusions - Attachment 7 to 03/05/2003 NEI Meeting. (6 page(s), 3/5/2003)
- ML031180140 - Volunteer Plant Containment Pool Flow Analysis, Attachment 8 to 03/05/03 NEI Meeting. (21 page(s), 3/5/2003)
- ML031180154 - Volunteer-Plant (VP) ECCS Vulnerability Assessment, Attachment 9 to 03/05/03 NEI Meeting. (27 page(s), 3/5/2003)